Waterfall by Crown Group, Waterloo

Early works package (remediation, bulk excavation, CSM wall, foundation piling) for the Waterfall by Crown Group development at Waterloo.

Infinity by Crown Group, Green Square

This project involved on-site screening, remediation and removal of contaminated soils, with a total of 64,000m3 of bulk excavation.

Quartet, Lane Cove

Early works package for Quartet (demolition, remediation, bulk excavation, shoring, foundation pads, sewer & stormwater diversions)

FASS Building at Sydney University

Project involved demolition, remediation, bulk excavation, shoring and foundation pads works carried out at the FASS Building at Sydney University.

Blacktown Hospital for NSW Health

Project involved remediation & bulk excavation works carried out at Blacktown Hospital for NSW Health.

Discovery Point, Wolli Creek

Multiple stages requiring: piling, remediation, civil works, anchors and bulk excavation.

Morton St, Parramatta

Cut and fill, retention works including capping beam, anchors, shotcrete wall, remediation and pile spoil handling and civil works.

Allengrove Crescent, North Ryde

Scope included more than 45,000m³ bulk excavation with full shoring works package including shoring piles, capping beam and shotcrete.

Parnell St, Strathfield

13,000m³ bulk excavation and full shoring works including piling, capping beam, anchoring and shotcreting.

Archer St, Chatswood

Scope included 20,000m³ bulk excavation to 5 basements including full shoring works package.

Burwood Plaza

Project included demolition of existing 5 storey building, shoring and civil works.

Angas St, Meadowbank

Demolition of existing warehouse included asbestos removal and remediation works. Bulk excavation scope dug into over 40,000m³ of rock, completed at a record time.

Hilmer St, Frenchs Forest

Remediation of the fuel station, fuel-tank installation and new concrete pavement works.

Australia Towers 2, Sydney Olympic Park

The project required piling, bulk excavation (96,000m3), temporary anchoring and shotcreting.

Grantham Street, Potts Point

Project involved demolition of concrete reinforced residential building tower.

Clemton Park Village

The scope of this project included bulk excavation, detail excavation, shotcreting and removal of existing ENM stockpiles fit to a bespoke solution in a challenging environment.

Quarry Rd, Erskine Park

Ground civil works for a 12,000m² facility, including drainage, storage tank, soldier/precast retaining walls with external concrete pavements.

Herring Rd, Macquarie Park

Executed works on 22,433m² of residential and commercial space comprised of structural steel, reinforced concrete, asbestos and polystyrene panels.

Turrella Road, Turrella

14,623m² of offices and warehouse space comprised of structural steel, reinforced concrete including asbestos and polystyrene panels.

Brodie Spark Drive, Wolli Creek

Retaining structures (a concrete in-situ wall) and conduct bulk excavation, detail excavation, anchoring and dewatering during works.

Warriewood Waste Water Treatment Plant

Project included bulk excavation, treating acid sulphate soil and the new construction of roads and storm water drainage.

Kingsgrove Rd, Kingsgrove

Demolition of 6 houses and existing 3 warehouses. Moits was engaged as the principal contractor.

Forest Rd, Hurstville

Works included removal of structural steel, reinforced concrete and a large quantity of asbestos.

ANZAC Bridge

Demolition of concrete reinforced silos and other structural steel structures.

Stockyard Creek, Oberon

Remediation of a contaminated stockyard creek in Oberon, including all environmental and sediment control, landscaping and vegetation control.